
Your BuildingIs Built.Now Who Runs It?
From possession to handover to long-term management — Kana Mirai is your single point of accountability for residential communities.
Builder-to-Association Transition
“We finished building. But maintaining it for a year and forming the association is draining our resources and creating legal risk.”
- Operations takeover from Day 1 of possession
- Legal formation of the Owners' Association
- Structured handover — zero liability left on you
- Long-term facility management post-handover
Association Takeover Support
“Our builder is handing over, but we don't know what to check, what documents to demand, or how to legally take control.”
- We represent your association through takeover
- A-to-Z asset verification: MEP, STP/WTP, electrical
- Snag identification & vendor closure tracking
- Seamless transition into professional FM
The 4-Stakeholder Operating Topology
Eliminating the historical friction between Builder, Association, and Residents. Every obligation is codified into measurable SLAs and legal accountability.
Kana Mirai (IFM Partner)
Single-Point Facility Operations & Engineering Command
Kana Mirai Integrated Facility Solutions
Single-Point Facility Operations & Engineering CommandIntegrated Operations, Preventive Maintenance & Resident Helpdesk
Obligations delivered BY Kana Mirai (IFM Partner) TO other stakeholders:
Formal snag log submissions with photographic proof, vibration logs, and engineering severity ratings.
Monthly executive governance packs, real-time daily telemetry, zero-defect SLA compliance, and 3-tier commercial spend firewalling.
< 15-minute emergency acknowledgment, 24/7 technical helpdesk, flawless common-area uptime, and mandatory Stage 6 digital/OTP closure verification.
The 6-Step Handover & Snag Defender
Most associations unknowingly inherit millions in builder construction snags. Kana Mirai executes a forensic 6-stage engineering audit to legally segregate builder liabilities before any takeover certificate is signed.
Document Review
Forensic Blueprint & Statutory Verification
Inspection Scope & Verification Points
- As-built architectural, structural, and MEP single-line diagrams (SLD)
- O&M manuals for all plant equipment (DG, STP, WTP, Lifts, Fire Hydrant)
- Statutory clearances: Fire NOC, KSPCB Consent to Operate (CTO), BESCOM load sanction, Lift licenses
- Original OEM warranty certificates and contractor defect liability agreements
Formal Handover Deliverables
- Document Gap Analysis Report
- Missing Drawings & NOC Compliance Register
- Warranty Expiry Timeline Chart
Sinking Fund Protection Simulator
Based on the grounded audit of Mana Capitol (691 units). See how our snag register transfers millions from association risk to builder OEM warranty.
Depleted directly from Association Sinking Fund Reserves within 12 months due to uninspected latent builder defects.
100% Builder OEM Rectification: ₹19,90,000 enforced via formal tripartite escrow snag retention.
Active Mana Capitol Snag Register
Click on any item to view engineering diagnostics, risks, and builder contract warranty citations.
Pump #2 of Grundfos Hydro Multi-E skid exhibits severe acoustic cavitation (86 dBA) and 0.45mm axial shaft deflection. Suction pipe geometry has inadequate straight pipe run, causing flow turbulence and premature bearing wear.
Institutional Governance & Command Suite
Eliminating vendor ambiguity through 4 interconnected control engines: live SLA pipelines with Anti-Ghost closure, 12-attribute equipment twins, OSHA-standard 9-point SOPs, and board-ready telemetry decks.
8-Stage Complaint SLA Pipeline & Anti-Ghost Closure
Real-time priority-tiered escalation hierarchy paired with cryptographic resident OTP verification, guaranteeing that zero tickets are closed without verified tenant satisfaction.
Automated dispatcher push to duty technician with 7-min auto-escalation.
Max Resolution Cap: < 2 Hours from opening.
Automated Escalation Tree (P1)
8-Stage Resolution Scrubber
Click any stage below to inspect the actor, deliverables, and automated audit checks.
Resident Digital Confirmation (Anti-Ghost Closure)
CRITICAL INSTITUTIONAL SAFEGUARD: The ticket CANNOT be marked closed by the technician or FM. A one-time security OTP (or digital signature) must be provided by the resident verifying the work is 100% satisfactory.
Anti-Ghost Closure Security Simulator
Test the security rule that stops technicians from closing tickets without resident sign-off. Attempt an unauthorized bypass, or enter the resident's cryptographic one-time code.
In traditional facilities management, technicians tap "Job Completed" from the basement without tenant inspection. Test what happens when Kana Mirai stops this:
* Resident receives OTP via SMS/App only after physical inspection of technician work. Press Enter or click Verify.
60-Day Takeover & Stabilization Roadmap
Eliminating handover chaos through a structured 3-phase takeover protocol. Every asset barcoded, every SOP activated, and every builder snag formally documented within the first 60 days of operations.
Takeover & Mobilize
Establish single-point operational accountability, prevent service vacuum, verify all physical assets, and legally segregate builder defects.
Joint physical handover walkthrough and comprehensive asset condition scoring (1-100%)
Deploy full-time on-site Facility Manager, licensed electrical/plumbing technicians, and security force
Audit all pending builder snags, OEM warranties, and statutory compliance gaps
Activate 24/7 helpdesk with 8-stage complaint tracking and Anti-Ghost resident OTP sign-off
60 Days of Uncertainty & Finger-Pointing
Untracked builder defects get quietly inherited by the Association; no asset register exists; preventive maintenance is neglected; technicians operate without SOPs; and resident complaints spiral out of control.
Systematic 60-Day Stabilization Guarantee
Full-time chartered Facility Manager on-site on Day 1; 140+ assets tagged with condition scores; all builder snags legally quarantined with escrow backup; and utility plants running with 99%+ SLA.
The Commercial Firewall: Zero Sinking Fund Leakage
We eliminate unauthorized contractor spend, prevent vendor duplicate billing, and establish unambiguous demarcation between in-house routine FM scope and specialist OEM AMCs.
Minimum 2 competitive quotations from registered vendors OR pre-negotiated annual rate-contract vendor.
Requires dual digital signature of Secretary and Treasurer on Kana Mirai governance portal before purchase order generation.
Tier 1: Facility Manager Petty Cash
Single commercial receipt or standardized rate-card purchase from pre-approved local suppliers.
Tier 2: Association Committee Approval
Minimum 2 competitive quotations from registered vendors OR pre-negotiated annual rate-contract vendor.
Tier 3: Executive Board Resolution & Tender
Mandatory minimum 3 independent sealed/digital bids based on standardized RFP engineering scope.
Commercial Safeguard Proven at Mana Capitol (Sarjapur Road)
Enforcing this 3-tier boundary blocked ₹68,500 in unauthorized duplicate AMC bills during Year 1 by rejecting external contractor invoices for routine filter cleans already performed by Kana Mirai technicians.
Safety, EHS & 60-Second Emergency Readiness
Industrial-grade life safety protocols applied to luxury residential infrastructure. From digital Lockout/Tagout (LOTO) to rapid 60-second utility failure protocols, we guarantee zero panic and instant stabilization.
Grid Blackout & Substation Incomer Failure
Synchronized DG Auto-Mains Failure (AMF) & Essential Load Transfer Protocol
Initial Detection & Telemetry Alarm
Microprocessor undervoltage relay senses bus voltage drop (< 360V). Automatic start signal transmitted to dual Cummins 500kVA AMF synchronizing controllers. Kana Mirai BMS triggers audible alarm in BMS Command Room.
Engine Crank & Frequency Synchronization
Both 500kVA Cummins diesel engines crank simultaneously. Engine speed reaches rated 1500 RPM with terminal voltage at 415V / 50Hz. Electronic synchronizer achieves phase matching within 14 seconds.
Critical Load Transfer & Lift Rescue
Automatic Transfer Switches (ATS) close essential bus: 10 Otis High-Speed Lifts, emergency staircase pressurization, and basement exit lighting energized. Lift ARD (Automatic Rescue Device) verifies zero passenger entrapment.
Utility Stabilization & Resident Notification
Hydro-pneumatic domestic booster pump VFDs soft-start sequentially to prevent water hammer. Automated status broadcast dispatched to resident app announcing DG live backup. Diesel fuel stock logged (1,420L = 18+ hrs run time).
100% Essential Services Stabilized in 38 Seconds. Diesel Stock: 1,420 Litres.
Automated alert SMS dispatched to MCAOA President & Secretary; BESCOM outage fault ticket logged online.
6 Institutional Pillars: Why Communities Choose Us
We operate as your dedicated engineering and facility governance partner — protecting sinking funds, guaranteeing statutory compliance, and extending asset lifespans from Day 1.
Single Point Accountability
A full-time, senior chartered Facility Manager stationed on-site to direct technical teams, coordinate vendors, manage resident expectations, and report to the Board. No buck-passing, no call-center labyrinths.
Measurable SLA Response
Rigorous response time commitments backed by an automated 8-stage complaint engine. Stage 6 resident digital/OTP verification prevents false 'ghost closures' and enforces technician accountability.
Capital Asset Protection
Shifting from reactive firefighting to precision planned preventive maintenance (PPM). Protecting multi-crore transformers, DGs, and treatment plants while defending association reserve funds.
Commercial Cost Visibility
Clear legal and financial separation between in-house routine FM tasks and specialist OEM AMC scope. A rigorous 3-Tier spending hierarchy ensures complete transparency on every purchase.
Absolute Transparency
The Committee receives verifiable facts, historical trends, and actionable items — not just anecdotal complaints. Monthly executive slide decks provide audit-grade governance intelligence.
Operational Continuity
Operations are rooted in documented, measurable procedures rather than individual staff memory. A trained bench strength ensures zero drop in service quality during staff absences or attrition.
Operate as a facility management partner — not merely as a manpower supplier.
Mana Capitol • 691 Units • ₹19,90,000+ Sinking Fund Shielded • 99.4% SLA Adherence
Ready to Transition?
Let's talk about your project — whether it's a fresh handover or a long-term management contract.
+91 96206 39754
Phone & WhatsApp
info@kanamirai.com
Priority Support
Bengaluru HQ
AGB Layout, Chikkabanavara

